Plunge Pool Installation in Danvers, MA
Plunge pools in Danvers, planned from our home shop around the town's 50-foot wetland line, its own pool fence bylaw and the Ipswich River watering levels.
Plunge pools in Danvers
What to know before you start.
Danvers has a pool bylaw of its own, and Inspectional Services spells out the order of work. The electrician's permit is issued first, then the pool permit, backed by a certified plot plan. Once the hole is open it gets a construction fence and an excavation inspection before backfill. The permanent fence has to be up within seven days of the pool being finished.
The ground matters as much as the paperwork. On the drumlins in the north and center, ledge can sit right where a pool wants to go, so we probe before committing to a spot. Close to Danversport's marsh or any wetland, the pool and its deck count against the small share of the 50-foot no-build zone that can be altered. Fill day gets scheduled around the watering level, since Levels 5 and 6 ban filling pools.



Pool decks, coping and site work by our crew around the North Shore. See more of our work.
Local rules that can affect your plunge pool project.
No-disturb and no-build zones
The first 35 feet from a wetland is a no-disturb zone and the first 50 feet is a no-build zone. Only a small share of each zone on a lot can be altered (10% and 20%), and the Commission can't waive those limits.
Source: Danvers Wetlands Regulations ↗Pool permits and fencing
A licensed electrician's permit comes before the pool permit, and the application needs a certified plot plan with the pool, fence and gates measured to the lot lines. The fence must be at least 48 inches, with gates that open out, self-close and self-latch, latch 54 inches or higher. Doors and low windows that open to the pool need alarms. A construction fence goes up once the hole is dug, and the permanent fence within 7 days of finishing.
Source: Danvers pool, spa & hot tub requirements ↗No pool filling at Levels 5 and 6
Danvers's watering system lists filling swimming pools as banned at Level 5 (hand watering only) and Level 6 (no outdoor water use). Check the town's page for the current level before a fill date is set.
Source: Danvers Outdoor Water Use Restrictions ↗
We check the current requirements for every project before we start.
Can a new pool be filled during a Danvers watering restriction?
Not at Level 5 or Level 6. The town lists filling swimming pools as banned at both. We look up the current level on the town's page before booking the fill.
When does the pool fence have to be finished in Danvers?
A construction fence goes around the hole as soon as it's dug, and the permanent fence has to be up within seven days of the pool being completed. Gates must open out and close and latch on their own.
Let's talk about your plunge pool in Danvers.